Four NVL72 racks, six truck battery packs and warm-water cooling in one 20 ft box. The model turns on its own; drag to look around.

Explore every part in 3D →
Windrose Electric

Compute

AI Compute in a 20 ft Container, Running on Truck Batteries

4
GB300 NVL72 Racks
288
Blackwell Ultra GPUs
528–620 kW
IT Load
671 kW
Facility Load · PUE 1.08
1,051 kWh
On-board Battery

Overview

A Data Hall in a Shipping Container

Compute puts four NVIDIA GB300 NVL72 racks — 288 Blackwell Ultra GPUs — into one 20 ft high-cube container, with six unmodified Windrose E700 battery packs on board. The packs carry the box for 1.4 hours at full load; with one Windrose Power container docked on the same DC bus, for 3.2 hours. The racks are cooled by warm water, so there is no chiller anywhere in the loop.

🔋
Same pack as the E700
6 × 176 kWh LFP on board
💧
No chiller
45 °C warm-water cooling
🔌
Docks to Windrose Power
Shared DC bus · 1,200 A inlet

Inside the Container

Racks, Batteries, Power and Cooling

Four NVL72 racks

Side by side and turned 90° so the fronts face one cold aisle. Each rack holds 18 compute trays (2 Grace CPUs + 4 Blackwell Ultra GPUs each) and 9 NVLink switch trays, 132–142 kW nominal and 155 kW peak.

Sealed battery bay

Six E700 LFP packs, 1,051 kWh, behind an EI 60 fire-rated bulkhead. At full load each pack runs at 0.65C. The bay has its own 15 kW cooling, off-gas detection, aerosol suppression and roof deflagration vents.

Power conversion

A 2 × 500 kW bidirectional PCS turns the 595–869 V pack bus into 415 V three-phase. A 1,250 A overhead busway feeds each rack’s power shelves.

Warm-water cooling

Two 700 kW coolant distribution units (N+1) feed the racks at 45 °C and take them back at 57 °C. A roof dry cooler with four EC fans rejects the heat. Two 30 kW room-air units handle what the cold plates do not catch.

Specification Sheet

Full Technical Specifications

CategoryItemParameters
ComputeRacks4 × NVIDIA GB300 NVL72
GPUs288 Blackwell Ultra (72 per rack, one NVLink domain per rack)
IT load528–620 kW (155 kW peak per rack)
Facility load671 kW · PUE 1.08
EnergyOn-board battery6 × Windrose E700 LFP pack, 1,051 kWh
Runtime at full load1.4 h on its own packs · 3.2 h with one Windrose Power
Power DC inlet1,200 A / 1,000 V DC
PowerPCS2 × 500 kW bidirectional, 415 V three-phase, 98.2 % peak efficiency
Busway1,250 A plug-in, one tap-off per rack
CoolingCoolant distribution2 × 700 kW CDU, N+1
Rack loop45 °C supply / 57 °C return, no chiller
Heat rejectionRoof dry cooler, 4 × EC fans
SafetyBattery bayEI 60 bulkhead, gas detection, aerosol suppression, deflagration vents
Rack zoneClean-agent (Novec 1230) suppression, aspirating smoke detection
ContainerSize20 ft high-cube: 6,058 × 2,438 × 2,896 mm

Planning AI capacity at a site?

Contact us — we'll size Compute and Power for your racks, site and grid connection.

Contact Windrose →